School/Project
|
Year
|
Cost
|
|
|
Daisy Elem, HVAC Control
|
99 Capital
|
$ 21,985
|
|
|
Falling Water, Fire Alarm
|
99 Capital
|
$ 19,598
|
|
|
Red Bank Hi, Reroof gym
|
99 Capital
|
$ 125,979
|
|
|
Red Bank Hi, Asbestos
|
99 Capital
|
$ 78,253
|
|
|
Red Bank Mid., HVAC Con
|
99 Capital
|
$ 9,817
|
|
|
Soddy Elem, Reroof Aud.
|
99 Capital
|
$ 134,815
|
|
|
Soddy-Daisy Hi, AC Gym
|
99 Capital
|
$ 141,248
|
|
|
Soddy Mid., HVAC Control
|
99 Capital
|
$ 11,768
|
|
|
Thrasher, Remodel for K-5
|
99 Capital
|
$ 83,287
|
|
|
White Oak, Asbestos & Lights
|
99 Capital
|
$ 273,275
|
|
|
Big Ridge, Elev.
|
99 Capital
|
$ 11,466
|
*
|
|
Hixson Hi, Bleachers, Gym
|
99 Capital
|
$ 98,808
|
|
|
CSAS, Boiler Replacement
|
99 Capital
|
$ 98,943
|
|
|
Normal Park, Partial Reroof
|
99 Capital
|
$ 130,752
|
|
|
Orchard Knob Mid. Reroof
|
99 Capital
|
$ 563,268
|
|
|
Brainerd Hi, Bleachers
|
99 Capital
|
$ 115,045
|
|
|
Brainerd Hi, AC Gym
|
99 Capital
|
$ 179,491
|
|
|
Dalewood Mid, Door Hdwe
|
99 Capital
|
$ 50,988
|
|
|
Dalewood Mid, Paving
|
99 Capital
|
$ 33,350
|
|
|
Dalewood Mid, HVAC Cont.
|
99 Capital
|
$ 170,718
|
|
|
Chatt. Hi, Fire Alarm
|
99 Capital
|
$ 57,198
|
|
|
Chatt. Hi, HVAC Controls
|
99 Capital
|
$ 186,700
|
|
|
Shepherd, HVAC Controls
|
99 Capital
|
$ 93,963
|
|
|
Tyner Hi, Reroof Gym
|
99 Capital
|
$ 90,518
|
|
|
Tyner Mid, Elev, Ramps, RR
|
99 Capital
|
$ 11,455
|
*
|
|
Tyner Mid, Door Hdwe
|
99 Capital
|
$ 29,392
|
|
|
E. Ridge Elem, Door Hdwe
|
99 Capital
|
$ 18,350
|
|
|
E. Ridge Hi, HVAC Controls
|
99 Capital
|
$ 14,992
|
|
|
McBrien, Reroof
|
99 Capital
|
$ 239,298
|
|
|
Brown Mid, Recoat Roof
|
99 Capital
|
$ 261,335
|
|
|
Central Hi, Bleachers, Gym
|
99 Capital
|
$ 111,044
|
|
|
Central Hi, Relight Ball Field
|
99 Capital
|
$ 117,106
|
|
|
HBVS, HVAC Controls
|
99 Capital
|
$ 14,738
|
|
|
Ool. Elem, Paving
|
99 Capital
|
$ 22,038
|
|
|
Ool. Elem, RR Renovation
|
99 Capital
|
$ 15,518
|
|
|
Ool. Elem, Paint, Int. & Ext.
|
99 Capital
|
$ 5,222
|
|
|
Ool. Hi, Bleachers, Gym
|
99 Capital
|
$ 106,189
|
|
|
Snow Hill, HVAC Controls
|
99 Capital
|
$ 14,953
|
|
|
Alpine Crest, Reroof
|
00 Capital
|
$ 267,640
|
|
|
Sale Ck. Gym Floor Sand
|
00 Capital
|
$ 13,500
|
|
|
Soddy Hi, Floor tile replc.
|
00 Capital
|
$ 26,071
|
|
|
Soddy Hi, Gym Floor Sand
|
00 Capital
|
$ 12,971
|
|
|
Soddy Hi, Reroof Boiler Rm
|
00 Capital
|
$ 5,524
|
|
|
Soddy Mid.,Bleacher Repl.
|
00 Capital
|
$ 54,455
|
|
|
Soddy Mid, Sewer install
|
00 Capital
|
$ 85,436
|
|
|
Soddy Mid, Gym AC
|
00 Capital
|
$ 82,169
|
|
|
Soddy Elem, Repair Boiler
|
00 Capital
|
$ 2,369
|
|
|
Old Soddy, Demolition
|
00 Capital
|
$ 130,380
|
|
|
Thrasher, Hook up Sewer
|
00 Capital
|
$ 83,405
|
|
|
Dupont, Bus Awning
|
00 Capital
|
$ 13,938
|
|
|
Hixson Hi, AC Gym, Chiller
|
00 Capital
|
$ 328,955
|
|
|
Hixson Mid, RR Upgrade
|
00 Capital
|
$ 40,950
|
|
|
McConnell, HVAC
|
00 Capital
|
$ 150,000
|
|
|
CSAS, Bleacher Replacement
|
00 Capital
|
$ 64,686
|
|
|
CSAS, Gym Floor Sanding
|
00 Capital
|
$ 13,121
|
|
|
CSAS, Carpet Replacement
|
00 Capital
|
$ 1,575
|
|
|
Clifton Hills, Reroof
|
00 Capital
|
$ 296,277
|
|
|
Clifton Hills, HVAC Modify
|
00 Capital
|
$ 11,855
|
|
|
Donaldson Annex, Reroof
|
00 Capital
|
$ 52,908
|
|
|
Garber, Driveways
|
00 Capital
|
$ 38,748
|
|
|
Hillcrest, Asbestos Abatement
|
00 Capital
|
$ 3,902
|
|
|
O. Knob Elem. Fuse Panels
|
00 Capital
|
$ 1,667
|
|
|
Howard HI, Convert Boiler
|
00 Capital
|
$ 2,289
|
|
|
O. Knob Elem. Retube Boiler
|
00 Capital
|
$ 7,041
|
|
|
Brainerd Hi, Resurface Trac
|
00 Capital
|
$ 25,450
|
|
|
Brainerd Hi, Asbestos/Abt.
|
00 Capital
|
$ 100,339
|
|
|
Brainerd Hi, Sewer Connec
|
00 Capital
|
$ 8,381
|
|
|
Brainerd Hi, Asbestos/Abt.
|
00 Capital
|
$ 4,690
|
|
|
Woodmore, Asbestos Abat
|
00 Capital
|
$ 3,902
|
|
|
Woodmore, Chiller HVAC
|
00 Capital
|
$ 64,803
|
|
|
Chatt. Hi, RR Upgrades
|
00 Capital
|
$ 40,309
|
|
|
Chatt. Hi, Rebuild Steps
|
00 Capital
|
$ 4,901
|
|
|
Chatt. Mid, RR Upgrades
|
00 Capital
|
$ 49,223
|
|
|
Chatt. Mid, AC Replacement
|
00 Capital
|
$ 24,244
|
|
|
Lkt Valley Elem, Retube Boiler
|
00 Capital
|
$ 9,623
|
|
|
E. Brainerd Elem, Asbestos
|
00 Capital
|
$ 16,152
|
|
|
Tyner Hi, Asbestos Abate
|
00 Capital
|
$ 4,809
|
|
|
Tyner Mid, Carpet
|
00 Capital
|
$ 1,556
|
|
|
Barger, HVAC change out
|
00 Capital
|
$ 7,808
|
|
|
CSLA, Sewer Line
|
00 Capital
|
$ 2,309
|
|
|
E. Ridge Hi, Door Hdwe
|
00 Capital
|
$ 48,780
|
|
|
E. Ridge Hi, RR Upgrade
|
00 Capital
|
$ 43,950
|
|
|
E. Ridge Hi, AC Gym
|
00 Capital
|
$ 161,664
|
|
|
E. Ridge Hi, ROTC Lighting
|
00 Capital
|
$ 10,112
|
|
|
Birchwood, Boiler Replace
|
00 Capital
|
$ 121,255
|
|
|
Birchwood, Gym Lights
|
00 Capital
|
$ 7,044
|
|
|
Brown Mid, Bleachers, Gym
|
00 Capital
|
$ 87,296
|
|
|
Brown Mid, RR Upgrades
|
00 Capital
|
$ 8,369
|
|
|
Central Hi, Stormwater Lines
|
00 Capital
|
$ 11,310
|
|
|
HBVS, Reroof
|
00 Capital
|
$ 223,038
|
|
|
Harr. Elem, Connect Sewer
|
00 Capital
|
$ 12,375
|
|
|
Harr. Elem, Asbestos Abate
|
00 Capital
|
$ 4,902
|
|
|
Hunter Mid, Fence
|
00 Capital
|
$ 7,904
|
|
|
Ool. Mid, Aud. Carpet
|
00 Capital
|
$ 3,596
|
|
|
Wolftever Ck, Fence
|
00 Capital
|
$ 9,912
|
|
|
Alpine Crest, Asbestos Abate
|
01 Capital
|
$ 6,766
|
|
|
Alpine Crest, Interior Paint
|
01 Capital
|
$ -
|
|
|
Daisy Elem, Floor Tile
|
01 Capital
|
$ 9,643
|
|
|
Falling Water, Asbestos Tile
|
01 Capital
|
$ 5,521
|
|
|
Falling Water, Water Heater
|
01 Capital
|
$ 7,577
|
|
|
Red Bank Hi, reroof partial
|
01 Capital
|
$ 350,050
|
|
|
Red Bank Hi, Asbestos
|
01 Capital
|
$ 1,050
|
|
|
Red Bank Hi, Ramps
|
01 Capital
|
$ 4,500
|
|
|
Sequoyah, Sewer Pumps
|
01 Capital
|
$ 6,159
|
|
|
Soddy Elem, Boiler Replace
|
01 Capital
|
$ 35,147
|
|
|
Soddy Mid., Gym Lighting
|
01 Capital
|
$ 7,080
|
|
|
Soddy Mid., Ceiling, Cafet.
|
01 Capital
|
$ 7,378
|
|
|
Soddy Mid, Paving
|
01 Capital
|
$ 18,061
|
|
|
Lookout Valley Hi, Asphalt
|
01 Capital
|
$ 46,112
|
|
|
Lookout Valley Hi, Paint
|
01 Capital
|
$ 2,476
|
|
|
Lookout Valley Hi, Asbestos
|
01 Capital
|
$ 3,996
|
|
|
Rivermont Elem, Asbestos Tile
|
01 Capital
|
$ 4,256
|
|
|
Signal Mtn. Mid., Boiler
|
01 Capital
|
$ 36,091
|
|
|
McConnell, HVAC
|
01 Capital
|
$ 383,993
|
|
|
Ganns, Fascia Replc.
|
01 Capital
|
$ 56,618
|
|
|
Hixson Elem, Fascia Replc
|
01 Capital
|
$ 83,865
|
|
|
Hixson Hi, Replace Roof
|
01 Capital
|
$ 273,511
|
|
|
Hixson Mid, Paving Repairs
|
01 Capital
|
$ 10,341
|
|
|
Hixson Mid, Sand Gym
|
01 Capital
|
$ 7,800
|
|
|
Hixson Mid, Fence
|
01 Capital
|
$ 8,639
|
|
|
CSAS, Paving Repairs
|
01 Capital
|
$ 22,274
|
|
|
Clifton Hills, Fire Code Improv.
|
01 Capital
|
$ 807,297
|
|
|
Franklin Middle, RR Upgrades
|
01 Capital
|
$ 46,953
|
|
|
Franklin Middle, Asbestos Abate
|
01 Capital
|
$ 5,288
|
|
|
Howard Elem, Exterior doors
|
01 Capital
|
$ 17,405
|
|
|
Howard Elem, Carpet & Ceiling
|
01 Capital
|
$ 10,566
|
|
|
Howard Elem, Corr. Ceiling
|
01 Capital
|
$ 10,752
|
|
|
Normal Park, Abate/carp/tile
|
01 Capital
|
$ 3,213
|
|
|
O. Knob Elem, Roof Repairs
|
01 Capital
|
$ 62,220
|
|
|
O. Knob Mid, Sand Gym Floor
|
01 Capital
|
$ 8,950
|
|
|
Garber, Asbestos Tile
|
01 Capital
|
$ 250
|
|
|
Howard Hi, Asbestos Abate
|
01 Capital
|
$ 1,920
|
|
|
O. Knob Elem., Asbestos Tile
|
01 Capital
|
$ 6,503
|
|
|
Brainerd Hi, Tile, Band Rm
|
01 Capital
|
$ 13,657
|
|
|
Dalewood Mid, Fence
|
01 Capital
|
$ 11,630
|
|
|
Woodmore, Floor tile
|
01 Capital
|
$ 4,040
|
|
|
Chatt. Hi, Photo Lab
|
01 Capital
|
$ 12,000
|
|
|
Eastside Center, Demolition
|
01 Capital
|
$ 109,050
|
|
|
Eastside Elem. Fence
|
01 Capital
|
$ 20,371
|
|
|
Lkt. Valley Elem, Ceiling Abate
|
01 Capital
|
$ 3,250
|
|
|
Lkt. Valley Elem, Floor Tile
|
01 Capital
|
$ 31,276
|
|
|
Lkt. Valley Elem Boiler Replac
|
01 Capital
|
$ 34,322
|
|
|
Ser. Cent. Roof Repair
|
01 Capital
|
$ 22,279
|
|
|
Service Center, Equipment Bldg.
|
01 Capital
|
$ 150,520
|
|
|
Chatt Hi, Asbestos Tile
|
01 Capital
|
$ 11,011
|
|
|
Shepherd, Aud. Lighting
|
01 Capital
|
$ 4,250
|
|
|
Tyner Hi, Gym Lighting
|
01 Capital
|
$ 6,401
|
|
|
Tyner Mid, Asbestos Tile
|
01 Capital
|
$ 3,108
|
|
|
East Brainerd Elem, Asbestos
|
01 Capital
|
$ 15,665
|
|
|
21st. Cent, Reroof
|
01 Capital
|
$ 487,856
|
|
|
CSLA, Asbestos Abate, Tile
|
01 Capital
|
$ 12,402
|
|
|
CSLA, Paving
|
01 Capital
|
$ 13,374
|
|
|
E. Ridge Hi, Replace Intercom
|
01 Capital
|
$ 30,000
|
|
|
E. Ridge Mid, Sand Gym Floor
|
01 Capital
|
$ 8,975
|
|
|
E. Ridge Mid, Door Hdwe
|
01 Capital
|
$ 44,316
|
|
|
Birchwood, Ceiling & Lights
|
01 Capital
|
$ 16,519
|
|
|
Birchwood, Fascia
|
01 Capital
|
$ 81,578
|
|
|
Birchwood, RR Upgrades
|
01 Capital
|
$ 16,905
|
|
|
Brown Middle, Asbestos
|
01 Capital
|
$ 538
|
|
|
Brown Mid, Ext. Paint
|
01 Capital
|
$ 28,732
|
|
|
Central Hi, HVAC (Partial)
|
01 Capital
|
$ 429,799
|
|
|
Central Hi, Ext. Paint
|
01 Capital
|
$ 40,578
|
|
|
Central Hi, Carpet
|
01 Capital
|
$ 32,289
|
|
|
Ool. Hi, Stadium Lighting
|
01 Capital
|
$ 124,400
|
|
|
Ool. Hi, Stadium RR (Partial)
|
01 Capital
|
$ 50,000
|
|
|
Ool. Mid, RR Upgrades
|
01 Capital
|
$ 26,602
|
|
|
Red Bank Hi, Relocate Port
|
02 Capital
|
$ 7,752
|
|
|
Red Bank Hi, Mold Removal
|
02 Capital
|
$ 22,080
|
|
|
Sale Creek, Wire Glass, Doors
|
02 Capital
|
$ 943
|
|
|
Sale Creek, Relocate Port.
|
02 Capital
|
$ 35,684
|
|
|
Red Bank High, Asbestos
|
02 Capital
|
$ 930
|
|
|
Red Bank Middle, Asbestos
|
02 Capital
|
$ 850
|
|
|
Red Bank Middle, Mold Remed.
|
02 Capital
|
$ 31,640
|
|
|
Chatt. Hi, Asbestos Tile
|
02 Capital
|
$ 7,024
|
|
|
Sig. Mtn. Middle, Gym Doors Repl
|
02 Capital
|
$ 10,881
|
|
|
White Oak, Replace Boiler
|
02 Capital
|
$ 41,381
|
|
|
Lookout Mtn. Portable, Sewage
|
02 Capital
|
$ 4,200
|
|
|
Sig. Mtn. Middle, Mold Remediat.
|
02 Capital
|
$ 860
|
|
|
Ganns, Relocate Port
|
02 Capital
|
$ 3,876
|
|
|
Hixson Hi, Relocate Port
|
02 Capital
|
$ 7,752
|
|
|
Hixson Hi, Asbestos Ceiling
|
02 Capital
|
$ 700
|
|
|
Hixson Hi, HVAC Controls
|
02 Capital
|
$ 373,286
|
|
|
Hixson Elem, Replace Boiler
|
02 Capital
|
$ 56,080
|
|
|
McConnell, Relocate Port
|
02 Capital
|
$ 3,876
|
|
|
Clifton Hills, Asbestos Floor Tile
|
02 Capital
|
$ 4,894
|
|
|
Donaldson, Asbestos Tile
|
02 Capital
|
$ 500
|
|
|
Hillcrest, Relocate Port.
|
02 Capital
|
$ 4,788
|
|
|
O. Knob Elem, Asbestos Tile
|
02 Capital
|
$ 14,071
|
|
|
O Knob Middle, Asbestos Tile
|
02 Capital
|
$ 1,131
|
|
|
Brainerd Hi, Main Elec. Ser
|
02 Capital
|
$ 62,669
|
|
|
Chatt. Middle, Kitchen Hood
|
02 Capital
|
$ 54,833
|
|
|
Lkt. Valley Elem, Relocate Port
|
02 Capital
|
$ 8,448
|
|
|
Chatt. Middle, Asbestos Tile
|
02 Capital
|
$ 1,188
|
|
|
Lkt. Valley Elem, RR Renov.
|
02 Capital
|
$ 17,955
|
|
|
Tyner Middle RR Renovation
|
02 Capital
|
$ 37,586
|
|
|
East Ridge Elem. Mold Remed.
|
02 Capital
|
$ 7,552
|
|
|
McBrien, RR Renovation
|
02 Capital
|
$ 19,641
|
|
|
21St. Cent, RR Renovation
|
02 Capital
|
$ 26,975
|
|
|
Hunter Mid, Relocate Port
|
02 Capital
|
$ 15,504
|
|
|
Birchwood, Mold Removal
|
02 Capital
|
$ 3,913
|
|
|
Brown Mid, Asbestos Tile
|
02 Capital
|
$ 2,450
|
|
|
Ool. Elem, Asbestos Tile
|
02 Capital
|
$ 1,357
|
|
|
Ool. Elem, Replace Boiler
|
02 Capital
|
$ 45,057
|
|
|
Summit Center, Boiler
|
02 Capital
|
$ 16,096
|
|
|
Seq. Voc. HVAC Controls
|
03 Capital
|
$ 30,000
|
|
|
Red Bank Labs (H. S. Reform)
|
03 Capital
|
$ 46,363
|
|
|
Normal Park Retaining Wall
|
03 Capital
|
$ 88,571
|
|
|
Brainerd Hi Academy Modifications
|
03 Capital
|
$ 52,991
|
|
|
Brainerd Hi Replace Gym Floor
|
03 Capital
|
$ 106,453
|
|
|
East Ridge Hi Exterior Doors
|
03 Capital
|
$ 2,760
|
|
|
Wallace Smith Replace HVAC Cont
|
03 Capital
|
$ 24,667
|
|
|
Sale Creek Gym Bleachers
|
03 Comm
|
$ 75,320
|
**
|
|
Rivermont Reroofing
|
03 Comm
|
$ 294,400
|
**
|
|
Red Bank High HVAC Gym
|
03 Comm
|
$ 182,200
|
**
|
|
Hixson High Field House Renovation
|
03 Comm
|
$ 73,107
|
**
|
|
Hixson High Girl's Softball
|
03 Comm
|
$ 219,293
|
**
|
|
Clifton Hills Chiller/Boiler Repl.
|
03 Comm
|
$ 324,750
|
**
|
|
Central High HVAC Replacement
|
03 Comm
|
$ 1,000,000
|
**
|
|
Central High Girl's Softball Field
|
03 Comm
|
$ 274,091
|
**
|
|
Dawn @ White Oak RR Renovation
|
03 Comm
|
$ 18,164
|
**
|
|
CCA Chiller Replacement
|
03 Comm
|
$ 336,637
|
**
|
|
Ooltewah High Girl's Softball
|
03 Comm
|
$ 245,235
|
**
|
|
Central High Shower/Dressing Room Repair
|
03/04 Comm
|
$ 154,833
|
**
|
|
Soddy High, Tech Lab (H.S. Reform)
|
04 Capital
|
$ 77,530
|
|
|
Howard High (H. S. Reform)
|
04 Capital
|
$ 659,425
|
|
|
Tyner Academy (H.S. Reform)
|
04 Capital
|
$ 2,710
|
|
|
Chattanooga Middle Boiler
|
05/06 Capital
|
$ 33,156
|
|
|
Red Bank Middle AC Library & CDC
|
05/06 Capital
|
$ 46,426
|
|
|
Ganns Window Replacement
|
05/06 Capital
|
$ 225,000
|
|
|
Hixson High Floor Tile
|
05/06 Capital
|
$ 43,491
|
|
|
Big Ridge Boiler Replacement
|
05/06 Capital
|
$ 41,718
|
|
|
Big Ridge Chiller
|
05/06 Capital
|
$ 141,265
|
|
|
Hixson High Relight Gym
|
05/06 Capital
|
$ 9,565
|
|
|
CSAS AC Gym
|
05/06 Capital
|
$ 158,761
|
|
|
Central High Football Bleachers
|
05/06 Capital
|
$ 172,746
|
|
|
Brainerd High EMS Controls
|
05/06 Capital
|
$ 35,139
|
|
|
Brown Middle AC Gym
|
05/06 Capital
|
$ 183,120
|
|
|
Central High Relight Gym
|
05/06 Capital
|
$ 15,869
|
|
|
Central Ofc. Building 212
|
05/06 Capital
|
$ 344,345
|
|
|
Lookout Valley High Gym Lights
|
05/06 Capital
|
$ 9,565
|
|
|
Lookout Valley High AC Gym
|
05/06 Capital
|
$ 258,138
|
|
|
Shepherd Elem Replace Chiller
|
05/06 Capital
|
$ 54,812
|
|
|
East Ridge Hi Football Bleachers
|
05/06 Capital
|
$ 131,976
|
|
|
Ooltewah Elem Exterior Hardware
|
05/06 Capital
|
$ 9,885
|
|
|
Ooltewah High Kitchen AC
|
05/06 Capital
|
$ 70,855
|
|
|
Snow Hill Replace Chiller
|
05/06 Capital
|
$ 59,118
|
|
|
Snow Hill AC Kitchen
|
05/06 Capital
|
$ 49,635
|
|
|
Birchwood Reroof
|
05/06 Capital
|
$ 196,828
|
|
|
Soddy Hgh Football Bleachers
|
05/06 Capital
|
$ 139,925
|
|
|
Tyner Middle Replace Chiller
|
05/06 Capital
|
$ 46,276
|
|
|
Oolewah High EFIS Replacement
|
05/06 Capital
|
$ 59,000
|
|
|
Daisy Elem Restroom Improvements
|
06/07 Capital
|
$ 19,257
|
|
|
Sequoyah Bldg B Partial HVAC
|
06/07 Capital
|
$ 502,975
|
|
|
Soddy Middle Heating Pumps Replc.
|
06/07 Capital
|
$ 14,645
|
|
|
Red Bank High Refinish Gym Floor
|
06/07 Capital
|
$ 17,270
|
|
|
Normal Park EMS Controls
|
06/07 Capital
|
$ 22,215
|
|
|
Red Bank High Gym Lighting
|
06/07 Capital
|
$ 19,130
|
|
|
Big Ridge Driveway Improvements
|
06/07 Capital
|
$ 34,700
|
|
|
Hixson High Interior Locks
|
06/07 Capital
|
$ 52,307
|
|
|
Ganns Window Replacement
|
06/07 Capital
|
$ 179,252
|
|
|
Big Ridge Reroof
|
06/07 Capital
|
$ 495,717
|
|
|
Hixson Elem Partial HVAC Replace
|
06/07 Capital
|
$ 71,635
|
|
|
Orchard Knob Middle Window Blinds
|
06/07 Capital
|
$ 29,539
|
|
|
Donaldson, EMS Controls
|
06/07 Capital
|
$ 85,110
|
|
|
Orchard Knob Middle EMS Controls
|
06/07 Capital
|
$ 36,475
|
|
|
Woodmore Partial Reroof (kitchen)
|
06/07 Capital
|
$ 18,857
|
|
|
Brown Middle Gym Lighting
|
06/07 Capital
|
$ 9,565
|
|
|
Brown Middle EMS Controls
|
06/07 Capital
|
$ 53,943
|
|
|
Central High Intercom Replace
|
06/07 Capital
|
$ 44,904
|
|
|
Hillcrest Elem EMS Controls
|
06/07 Capital
|
$ 20,310
|
|
|
Lookout Valley Elem Interior Locks
|
06/07 Capital
|
$ 13,639
|
|
|
Lookout Valley High Interior Locks
|
06/07 Capital
|
$ 51,417
|
|
|
Lookout Valley High Gym Bleachers
|
06/07 Capital
|
$ 65,887
|
|
|
CCCA HVAC Music Room
|
06/07 Capital
|
$ 4,596
|
|
|
Lookout Valley Elem EMS Controls
|
06/07 Capital
|
$ 11,780
|
|
|
Tyner High Gym Bleachers
|
06/07 Capital
|
$ 80,700
|
|
|
Tyner High Gym Floor Replacement
|
06/07 Capital
|
$ 140,096
|
|
|
Tyner Middle Gym Bleachers
|
06/07 Capital
|
$ 66,290
|
|
|
Shepherd Elem Partial Reroof
|
06/07 Capital
|
$ 43,865
|
|
|
East Brainerd Elem EMS
|
06/07 Capital
|
$ 22,910
|
|
|
Tyner High Voc. Bldg HVAC & Contr
|
06/07 Capital
|
$ 91,346
|
|
|
Tyner Middle HVAC Cafeteria
|
06/07 Capital
|
$ 150,510
|
|
|
Ool. Elem Interior Door Locks
|
06/07 Capital
|
$ 6,031
|
*
|
|
Ool. High Interior Door Locks
|
06/07 Capital
|
$ 74,975
|
*
|
|
Ool. Middle Partial Reroof
|
06/07 Capital
|
$ 11,000
|
*
|
|
Ool. Middle Gym Bleachers
|
06/07 Capital
|
$ 62,733
|
|
|
Harrison Elem Replace Cafeteria AC
|
06/07 Capital
|
$ 14,168
|
|
|
Ool. Middle EMS Controls
|
06/07 Capital
|
$ 100,000
|
*
|
|
Wolftever Additional Boiler
|
06/07 Capital
|
$ 35,113
|
|
|
Barger, Driveway Improvements
|
06/07 Capital
|
$ 39,600
|
|
|
East Ridge Elem Partial Reroof
|
06/07 Capital
|
$ 34,499
|
|
|
Barger Boiler Replacement
|
06/07 Capital
|
$ 43,960
|
|
|
East Ridge High Football Field Lights
|
06/07 Capital
|
$ 156,734
|
|
|
East Ridge High Gym Lights
|
06/07 Capital
|
$ 19,130
|
|
|
Chattanooga Middle Bleachers
|
07/08 Capital
|
$ 53,372
|
|
|
Red Bank High EMS Controls
|
07/08 Capital
|
$ 168,800
|
|
|
Nolan Elem install addit. Boiler
|
07/08 Capital
|
$ 33,311
|
|
|
Hixson Elem Partial Roof Replace
|
07/08 Capital
|
$ 191,926
|
|
|
Hixson High Remove Fuel Tank
|
07/08 Capital
|
$ 34,504
|
|
|
Ganns Connect Sewer
|
07/08 Capital
|
$ 79,416
|
|
|
Hixson Elem AC Kitchen
|
07/08 Capital
|
$ 14,690
|
|
|
Hixson High Replace Boiler Voc Ed
|
07/08 Capital
|
$ 27,632
|
|
|
CSAS Bleachers Gym
|
07/08 Capital
|
$ 43,170
|
|
|
CSAS Gym Ceiling, Windows, Walls
|
07/08 Capital
|
$ 95,438
|
|
|
Orchard Knob Mid. Gym HVAC
|
07/08 Capital
|
$ 202,844
|
|
|
Central High ROTC Renov
|
07/08 Capital
|
$ 58,941
|
|
|
Brainerd High Interior Door Hdwe
|
07/08 Capital
|
$ 68
|
*
|
|
Lookout Valley High Gym Floor Refin
|
07/08 Capital
|
$ 11,608
|
|
|
Tyner Middle Refinish Gym Floor
|
07/08 Capital
|
$ 12,875
|
|
|
Tyner Middle Replace Boiler
|
07/08 Capital
|
$ 20,465
|
|
|
Ooltewah Middle Refinsih Gym Floor
|
07/08 Capital
|
$ 13,487
|
|
|
Hamilton Co High Replace roof-top HVAC
|
07/08 Capital
|
$ 529,225
|
|
|
Wolftever Creek Boiler Piping & Contr
|
07/08 Capital
|
$ 10,218
|
|
|
Birchwood Refinish Gym Foor
|
07/08 Capital
|
$ 12,275
|
|
|
Soddy Middle Cafeteria HVAC
|
08/09 Capital
|
$ 15,569
|
|
|
Chatt. Middle Replace boilers
|
08/09 Capital
|
$ 51,759
|
|
|
Hixson Elem Relight School
|
08/09 Capital
|
Grant Funded
|
|
|
Woodmore Partial Reroof (classrooms)
|
08/09 Capital
|
$ 250,580
|
|
|
Central Ofc. Partial HVAC replace
|
08/09 Capital
|
$ 52,045
|
|
|
CCA Replace boilers
|
08/09 Capital
|
$ 53,055
|
|
|
Tyner High Replace Canopy
|
08/09 Capital
|
$ 74,599
|
|
|
East Brainerd Elem Floor tile replace
|
08/09 Capital
|
$ 23,323
|
|
|
Tyner Middle Gym HVAC
|
08/09 Capital
|
$ 191,330
|
|
|
E. Ridge Middle Gym HVAC
|
08/09 Capital
|
$ 191,890
|
|
|
Ool. High ROTC Roof & EFIS
|
08/09 Capital
|
$ 58,873
|
|
|
Wolftever Elem Reroof
|
08/09 Capital
|
$ 268,060
|
|
|
Hunter Middle Sand & Refinish Gym
|
08/09 Capital
|
$ 13,860
|
|
|
Birchwood Replace Caf. Floor Tile
|
08/09 Capital
|
$ 16,992
|
|
|
Harrison Elem Repl.Café. & Kit. Roof
|
08/09 Capital
|
$ 67,973
|
|
|
Ool Mid Replace roof-top HVAC
|
08/09 Capital
|
$ 645,236
|
|
|
Allen Elem Walkway Cover
|
09/10 Capital
|
$ 12,730
|
|
|
Thrasher Replace walkway cover
|
09/10 Capital
|
$ 2,602
|
|
|
Red Bank Elem Chiller Repair
|
09/10 Capital
|
$ 29,967
|
|
|
CSAS Gym RR Renovation
|
09/10 Capital
|
$ 66,675
|
|
|
Howard Reroof
|
09/10 Capital
|
$ 1,900,300
|
*
|
|
Hardy Elem Chiller Repair
|
09/10 Capital
|
$ 56,889
|
|
|
Orch Knob Mid Replace Chiller
|
09/10 Capital
|
$ 75,790
|
*
|
|
Brainerd High Bistro HVAC
|
09/10 Capital
|
$ 12,552
|
|
|
Central Ofc HVAC Repair
|
09/10 Capital
|
$ 61,241
|
|
|
East Lake Elem Chiller Repair
|
09/10 Capital
|
$ 29,967
|
|
|
East Side Elem Chiller
|
09/10 Capital
|
$ 29,967
|
|
|
East Brainerd Elem Boiler Replace
|
09/10 Capital
|
$ 415
|
|
|
Harrison Elem Reroof Shingle Area
|
09/10 capital
|
$ 45,696
|
|
|
Ool High Sand Gym Floor
|
09/10 capital
|
$ 14,997
|
|
|
Ool Middle HVAC Gym
|
09/10 capital
|
$ 5,400
|
*
|
|
|
|
|
|
|
* Incomplete project
|
|
|
|
|
** Funded by County Commission
|
|
|
|